Beijing IWHR Corporation has finished an anti-seepage construction using plaster as the stabilizing slurry for the subway tunneling in Nanning, southwest China’s Guangxi Zhuang Autonomous Region.

The subway tunnel is below groundwater level in the strata of round pebble that has a high water content and permeability. As a result, the risk and difficulty is high when the shield tunneling machine is moving out of the station.

This is the first time such new method is used in subway construction, and has significantly decreased expenses and shortened the time needed for a sound effect of impermeability and reinforcement.


Shield tunneling machine moving out of station safely after anti-seepage and reinforcement treatment

Read more:
 ·IWHR effectively controls water bursts in diversion tunnel
 ·Bituminous concrete-faced anti-seepage technology for pumped-storage power plant and its application in Baoquan project
 ·Deze Reservoir Safety Monitoring for Water Diversion Project from Niulan River to Dianchi Lake
 ·IWHR Updates Governor of Baozishi Hydropower Station
 ·IWHR Upgrades Governors for Honghua Hydropower Station in Guangxi

     

A-1 Fuxing Road,Haidian District,100038 Beijing; +86-10-68781650 (office); +86-10-68412316 (fax); dic@iwhr.com

Produced By CMS 网站群内容管理系统 publishdate:2023/10/07 13:13:04